1. Our policy
We carry out TQM(total quality management) policy.
a. we calculate each dimension and tolerance carefully during the developing period of products.
b. we measure each component after it is produced.
c. we test each assembled product according to EN and Chinese standard.
2. Testing
(1) each mixer will be tested
a. leak tightness test at 5 bar.
b. temperature controlling test 38+_2.
c. cold water failure safety test.